In response to a congressional request, GAO analyzed data on the Bigeye bomb to determine whether it was ready for production. GAO found that: (1) only developmental testing information was available; (2) the bomb did not meet technical specifications and, therefore, operational testing should cease until the specifications are met; (3) the test results contained inconsistencies; (4) the test criteria were ambiguous and uncertain; (5) there was insufficient test data and analysis to resolve technical issues; and (6) ...
Read More
In response to a congressional request, GAO analyzed data on the Bigeye bomb to determine whether it was ready for production. GAO found that: (1) only developmental testing information was available; (2) the bomb did not meet technical specifications and, therefore, operational testing should cease until the specifications are met; (3) the test results contained inconsistencies; (4) the test criteria were ambiguous and uncertain; (5) there was insufficient test data and analysis to resolve technical issues; and (6) solutions to technical problems led to operational constraints and uncertainties. GAO concluded that: (1) the bomb was not ready for production; and (2) the Department of Defense should examine other technologies and chemical weapons to accomplish Bigeye's deterrent and retaliatory mission.
Read Less
Add this copy of Bigeye Bomb: An Evaluation of Dod's Chemical and to cart. $31.79, new condition, Sold by Booksplease rated 3.0 out of 5 stars, ships from Southport, MERSEYSIDE, UNITED KINGDOM, published 2013 by Bibliogov.
Add this copy of Bigeye Bomb: an Evaluation of Dod's Chemical and to cart. $41.36, good condition, Sold by Bonita rated 4.0 out of 5 stars, ships from Newport Coast, CA, UNITED STATES, published 2013 by Bibliogov.