"In 2013, construction crews raced to replace a crumbling elevated highway along Seattle's waterfront with a double-decker tunnel running almost two miles under the city. This is the story of Bertha, the mammoth and complex tunnel boring machine that simultaneously dug and built the tunnel, and Deputy Project Manager Greg Hauser and his dedicated crew"--
Read More
"In 2013, construction crews raced to replace a crumbling elevated highway along Seattle's waterfront with a double-decker tunnel running almost two miles under the city. This is the story of Bertha, the mammoth and complex tunnel boring machine that simultaneously dug and built the tunnel, and Deputy Project Manager Greg Hauser and his dedicated crew"--
Read Less
Add this copy of Big Bertha: How a Massive Tunnel Boring Machine Dug a to cart. $9.49, very good condition, Sold by HPB-Emerald rated 5.0 out of 5 stars, ships from Dallas, TX, UNITED STATES, published 2024 by Little Bigfoot.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
Very good. Connecting readers with great books since 1972! Used books may not include companion materials, and may have some shelf wear or limited writing. We ship orders daily and Customer Service is our top priority!
Add this copy of Big Bertha: How a Massive Tunnel Boring Machine Dug a to cart. $32.06, good condition, Sold by Bonita rated 4.0 out of 5 stars, ships from Newport Coast, CA, UNITED STATES, published 2024 by Little Bigfoot.